[Date Prev][Date Next][Thread Prev][Thread Next][Date Index][Thread Index]

Equil_phases



Hi David:

I have a SOLUTION_SPREAD of about 20 samples for
which I would like to estimate the amount of dissolved aluminum.

I have computed a value (EQUILIBRIUM_PHASES 1;  Gibbsite  0 10)
for a single sample but, would like to know if there a way to repeat
this command for each sample (in the SOL_SPREAD)?  Or do I
have to SAVE each 'initial solution 1-20'?

Thank you for your consideration,

M!chael


--------------------------

SOLUTION_SPREAD A-A Flowpath - Dominguez Gap - June02
    -pe        4
    -redox     O(0)/O(-2)
    -units     mg/L
    -density   1
    -water    1 # kg

number  description  temp pH O(0) Ca Mg K Na Li Cl F S(6) Si N(-3) N(5) Ba B Br Fe Mn Sr Alkalinity
          ug/L       ug/L ug/L  ug/L ug/L ug/L
1 Long Beach-2-1  27.5 8.4 0 6.75 1.47 2.42 143 12.3 20.9 0.7 0.3 22.6 1.41 0 6 546 0.2 100 12.4
66.8 315
2 Long Beach-2-2  24.5 8.2 0.2 12.9 1.62 2.13 89.7 4.7 19.8 0.4 2.2 23.6 0.744 0 7.1 200 0.07 20 18
129 200
3 Long Beach-2-3  24 8.4 0 12.4 1.27 1.56 73.5 7.2 22.3 0.6 27.2 21.2 0.378 0 3.8 141 0.06 20 13.6
74.3 142
4 Long Beach-2-4  23 8.1 0.8 35.1 3.99 2.97 60.1 7.5 28.8 0.4 46.3 23.8 0.195 0 18.1 96 0.1 0 23.4
318 142
5 Long Beach-2-5  21 7.5 0.6 149 21.4 5.05 107 6.5 97.1 0.2 257 27.4 0.217 0 82.9 254 0.8 80 148
1120 288
6 Long Beach-2-6  21 7.4 0.4 209 34.5 6.85 138 6.8 153 0.3 430 28.1 0.356 0 117 332 1.85 130 338
1600 308
7 Long Beach-3-1  22 8.4 0.1 11 3.47 3.81 156 8.5 18.5 0.5 1 20.2 2.47 0 8.7 372 0.07 30 18 120 380
8 Long Beach-3-2  23 8.4 0.2 15.9 2.73 2.5 61.5 4.6 18.8 0.4 25.3 22.6 0.323 0 10.1 138 0.09 0 10.8
191 138
9 Long Beach-3-3  23 8.3 0.4 17.9 3.24 2.71 55.8 5.1 24.8 0.4 0.2 23.8 0.361 0 12.8 132 0.09 0 11.3
226 150
10 Long Beach-3-4  22.5 7.8 2.6 88.8 24 6.24 72.9 11.2 213 0.3 57.9 28.6 0.406 0 31.3 109 1.96 0 102
962 130
11 Long Beach-3-5  22 7.6 0.2 238 57.3 7.84 98.6 12.7 619 0.2 62.7 23.7 0.557 0 109 110 6.5 120 284
2530 140
12 Long Beach-4-1c  23 8.2 0 9.57 4.63 5.78 259 26.5 21.4 1.1 3.6 28.1 2.38 0 14.9 1100 0.08 190
32.5 134 475
13 Long Beach-4-2c  24 8.2 0 6.55 7.18 10.8 422 23.3 337 0.5 1.4 35.3 2.83 0 17.2 1150 1.96 40 15.4
97.5 581
14 Long Beach-5-1f  22.8 7.8 0 17 30 26 1500 180 1600 0.4 0.7 41 10.5 0 130 8400 4.8 430 56 730 1200

15 Long Beach-5-2f  21.5 7.1 0 519 1220 272 10800 159 19900 0.4 2640 14.5 7.86 0 82 4130 36.1 7380
3240 8500 290
16 370-U  20.6 8.2 0 52.6 10.9 4.1 127 0 196 0.3 26.5 19.6 0 0 13.1 130 1.12 0 10.8 441 140
17 370-V  19.4 7.6 0 168 142 23.8 1020 0 2140 0.3 250 13.1 0 0 238 482 6.92 0 204 2270 230
18 371-D  23.9 8.7 0 6.42 1.41 3.41 89.3 0 41.9 0.3 0.01 14.5 0 0 3.2 149 0.14 10 1.5 53.2 170
19 889-P  23.4 8.3 0 29.2 5.59 3.53 109 0 107 0.3 0.2 23.3 0 0 6.1 312 0.5 0 0 310 190

EQUILIBRIUM_PHASES 1
    Gibbsite  0 10



Project Home Page
Complete Water Resources Division Software
USGS Home Page
Water Resources Division Home Page
NRP Home Page
Help Page
USGS Privacy Statement       

Please note that some U.S. Geological Survey (USGS) information accessed through this page may be preliminary in nature and presented prior to final review and approval by the Director of the USGS. This information is provided with the understanding that it is not guaranteed to be correct or complete and conclusions drawn from such information are the sole responsibility of the user.

Any use of trade, product, or firm names in this publication is for descriptive purposes only and does not imply endorsement by the U.S. Government. 


The URL of this page is: https://wwwbrr.cr.usgs.gov/projects/GWC_coupled/phreeqc/mail/msg00018.html
Email:dlpark@usgs.gov
Last modified: $Date: 2005-09-13 21:04:21 -0600 (Tue, 13 Sep 2005) $
Visitor number 2376 since Jan 22, 1998.