[Date Prev][Date Next][Thread Prev][Thread Next][Date Index][Thread Index]

[no subject]



Dear David,

I'm trying to execute a transport modelling of 1D-flowtube, containing an
ammonium contamination, that is flushed by pristine background water
(contains oxygen, but no ammonium).
Ammonium is retarded by cation exchange, which I can succesfully simulate.
But now I wanted to incorporate kinetic ammonium oxidation (inflowing
solution contains oxygen). I defined rates and kinetics in Phreeqc, but the
simulation allways ends after 7 transport steps.

Is it possible that this is due to the fact that the time to travel a 1m
cell (=1 shift)  is high (8.3333... days= 720 000s, because the effective
groundwater velocity = 0.11875m/d)?
I tried step_divide > 1 (till 1000), but this didn't seem to help.

Are these problems typically occurring when dealing with kinetics? have you
any suggestions to resolve this problem or did I make some error in my
kinetic formulation?

Thanks in advance and best regards,
bruno

Bruno Haerens
Hydrogeology & Engineering Geology
Dpt. Geography-Geology
Katholieke Universiteit Leuven
Redingenstraat 16
B-3000 Leuven (Belgium)
tel. +32-(0)16-326449
fax. +32-(0)16-326401
http://www.kuleuven.ac.be/geology/hsg/H&EG/H&EG.html


attached files:
input.pqi = input file for phreecI
phreeqc.dat = database file (ammonium considered as a seperate component
amm)
nitrification =  kinetic formulation of ammonium oxidation





Attachment: vgl_phreeqc_pht3d_interactive.pqi
Description: Binary data

Attachment: Phreeqc.dat
Description: Binary data

Attachment: Nitrification.doc
Description: MS-Word document



Project Home Page
Complete Water Resources Division Software
USGS Home Page
Water Resources Division Home Page
NRP Home Page
Help Page
USGS Privacy Statement       

Please note that some U.S. Geological Survey (USGS) information accessed through this page may be preliminary in nature and presented prior to final review and approval by the Director of the USGS. This information is provided with the understanding that it is not guaranteed to be correct or complete and conclusions drawn from such information are the sole responsibility of the user.

Any use of trade, product, or firm names in this publication is for descriptive purposes only and does not imply endorsement by the U.S. Government. 


The URL of this page is: https://wwwbrr.cr.usgs.gov/projects/GWC_coupled/phreeqc/mail/msg00002.html
Email:dlpark@usgs.gov
Last modified: $Date: 2005-09-13 21:04:21 -0600 (Tue, 13 Sep 2005) $
Visitor number [an error occurred while processing this directive] since Jan 22, 1998.